Moulamein Notebook- August 3, 2023
There is a lot of anger brewing about this proposed 500kV, 70-metre-high power line that is supposed to run through our Moulamein district.

There is a lot of anger brewing about this proposed 500kV, 70-metre-high power line that is supposed to run through our Moulamein district.